Airport Construction Cost & Schedule Forecasting
Airport works happen around a live operation. Productivity is set by how many hours you are allowed on site, not by how many people you can put there, and most forecasts miss that entirely.
Airport works happen around a live operation. Productivity is set by how many hours you are allowed on site, not by how many people you can put there, and most forecasts miss that entirely.
The method is the same everywhere. These are the sector conditions that make a generic approach wrong, and what each one means for how you control the project.
A six-hour night window yields far less than six hours of daytime work once mobilisation, escorting and demobilisation are deducted. Applying daytime rates overstates progress from day one.
Effective output can be under 50% of daytimeA runway reopens on time regardless of whether the work finished. Overruns are absorbed into future windows, quietly extending the programme.
The constraint is fixed; your work is notPasses, escorting, vehicle permits and security screening consume hours that never appear on a labour histogram.
A standing overhead on every shiftA lost night possession is rarely made up. It waits for the next available slot, which may be weeks away.
One lost night can cost a fortnightCrane permits, obstacle limitation surfaces and safeguarding sign-offs are prerequisites that behave like regulatory gates.
No approval, no work, no recoveryEvery tool below is a separate workbook that works on its own. These are the ones airports teams tend to reach for, and what each one answers.
The engine is identical across industries. The edition supplies the content that makes it speak your sector's language, so it is useful the first time you open it rather than after a fortnight of setup.
BAC £23M. EV £7.4M, AC £8.9M, PV £8.1M. Two possessions lost to weather, and effective night productivity is running at 61% of the daytime rate assumed in the baseline.
Illustrative figures, shown to demonstrate the method. Your numbers replace them.
Each of these is a sheet in the workbook. They recalculate when you enter the period progress, so there is nothing to assemble at month end.
Airports Edition £349, all eight editions £999, complete suite £1,399
Your email client should have opened with the details filled in. Press send and we'll reply within one business day.
If nothing opened, email us directly at sales@projectcontrolcenter.co.uk.